May 4
2019

Sewer connection

Sewer connection

The sewer connection is operated in accordance with the sewage order of the sewerage network into which the connection is to the mouth. The operation is intended to drain the sewage into the sewage network. The water authority may decide to exceptionally discharge waste water with a higher content of waste materials above the standards and framework of the sewerage order.
If more waste water with excessive content of substances is to be discharged into the sewage system, it is considered that only the sewer connection is not built, but also the equipment used for pre-treatment of the waste water. It is then already compliant with the sewer order. Regular analyses must be carried out.
Establishment of connections and sewers
If a new sewer connection must be established, please contact us. We work professionally, quickly, reliably and at good prices. We establish and repair water pipes and sewers.

Leave a Reply

Your email address will not be published. Required fields are marked *